Support at Every Project Stage
Specification & Drawing Support
Start with the information you already have. We review application, environment, supports, span, loads and layout drawings, then confirm the grating specification and panel schedule before production.

What the review covers
- Application, environment and governing project standard
- Bearing bar direction, clear spans and support conditions
- Uniform, concentrated or wheel-load inputs
- Material, surface, finish and opening requirements
- Panel sizes, cut-outs, banding, toe plates and removable areas
From layout to panel schedule
A general arrangement, PDF, CAD file or clear sketch can be the starting point. Missing inputs are listed instead of guessed.
The agreed layout is converted into piece-marked panels so fabrication, inspection, packing and site installation use the same references.
Process
How It Works
-
Share project inputs
Send the layout, supports, loads, environment and named standards.
-
Close information gaps
We list missing decisions and confirm the specification basis.
-
Detail the panels
Panel marks, bearing direction, openings and banding are shown.
-
Approve before production
Production starts from the confirmed specification and drawings.
Checklist
What to Prepare
- Layout, PDF, CAD file or measured sketch
- Support lines, clear spans and bearing direction
- Load type and magnitude
- Material, finish and project standards
- Cut-outs, removable areas and fixing requirements
- Quantity, destination and required documentation
FAQ
Specification & Drawing Support FAQs
Can you start from a hand sketch?
What if the bearing bar size is unknown?
Send Your Drawings, Get a Confirmed Specification
Complete inquiries are typically answered within 24 hours during business hours.