DONGFU GRATING logo

Guide

Steel Grating Clips, Fasteners and Installation Planning

By DONGFU GRATING Engineering Team · Published 2026-07-24 · Updated 2026-07-24

Grating clips and fasteners affect support layout, edge banding, removable areas and site access, so they belong on the panel drawing rather than at the end of the order. Show the bearing bar direction, clear span, support lines and minimum bearing. Mark every removable panel and any hinge, handle, lock or lifting point. Select the clip, saddle, bolt or other fastener for the grating construction and supporting member, then state its material and corrosion protection. Record panel joints, site clearances and fixing locations before fabrication so the delivered panels fit the steelwork and the packing list includes the correct accessories.

Confirm before fabrication

  • Bearing direction, support lines, clear spans and minimum bearing
  • Fixed and removable panel boundaries
  • Clip or fastener system, material and finish
  • Panel gaps, walls, curbs, penetrations and equipment clearances
  • Cut-outs, banding, toe plates, stair holes and nosing direction

Put installation information on the drawing

Use panel marks and a clear installation sequence. Show removable areas and fixing locations rather than relying on a general note.

If clips are included in the order, list type, finish and quantity in both the quotation and packing list.

FAQ

Questions About This Topic

Should panels be welded directly to supports?
The fixing method must follow the project design, material and maintenance requirements. Removable panels normally need a mechanical fixing system.
What should be shown for removable panels?
Mark the removable boundary, support edges, banding, fixing locations and any lifting, hinge, handle or locking details required by the project.

Send Your Drawings, Get a Confirmed Specification

Complete inquiries are typically answered within 24 hours during business hours.